🌎
This job posting isn't available in all website languages

Recruitment Fraud Warning: Learn more to protect yourself.

If you are a current Tetra Tech employee, please apply for career opportunities at the internal jobs website.

Senior Construction Scheduler

📁
Engineering
📅
11700000998 Requisition #
Thanks for your interest in the Senior Construction Scheduler position. Unfortunately this position has been closed but you can search our 1,196 open jobs by clicking here.

Required Qualifications:

  • BS degree in Civil Engineering, Mechanical Engineering, Construction Management, or closely related field.

  • 10+ years’ scheduling experience using Primavera P6 on pharmaceutical or large process-plant construction projects (10+ years required).

  • Deep knowledge of pharma construction sequencing (cleanrooms, process piping, HVAC, validation interface).

  • Strong analytical, reporting and communication skills.

  • Ability to perform field work/oversight in various environmental factors.

  • Ability to travel (approx. < 25% of travel required). 

  • A Pre-employment drug screening in compliance with state regulations is required. 

  • Must possess a valid driver's license with a clean driving record without restrictions. 

Preferred Qualifications:

  • Primavera P6 certification, PMI-SP, or AACE PSP desirable.

  • Experience with construction of pharmaceutical manufacturing facilities is ideal.

Physical Requirements: 

  • Ability to walk across variable terrain, including uneven ground, in all weather conditions (hot/cold temperatures, loud noises, heavy equipment, etc.).

  • Ability to travel periodically meeting within the Indianapolis metro area and oversee field work (approx. < 25% of travel required).

Work Environment / Environmental Factors:

  • This position is based out of the Indianapolis, IN office with the potential of a hybrid work schedule, but the candidate must reside within 50 miles of the local Indianapolis, IN office. This arrangement is subject to review and may change at the company’s discretion.

  • Field work/oversight will include work to be performed outside, as a result may include occasional work in various environmental factors (weather, altitude, terrain, noise, etc.). This can include remaining stationary for long periods of time, walking, bending, and sitting for site assessments, site walks, and other field oversight activities.

  • Office work will include extended periods sitting or standing at a desk and using a computer.

Additional Information:

  • Full-time, Monday through Friday work schedule (40 hours). Occasionally extended hours may be required based on project and/or client needs.

  • Work will be performed in an office and field setting.

Life at Tetra Tech:

The perks of working at Tetra Tech include:

  • Comprehensive and market-competitive benefits.
  • Tetra Tech offers the following optional benefits: Medical, Dental, Vision, Prescription, Accidental Death & Dismemberment, Long & Short-Term Disability, Health & Dependent Care Flexible Spending. Financial Benefits: Group Term Life, Optional Group Term Life Insurance, Business Travel Accident Insurance, Health Savings Account, 401K, Employee Stock Purchase Plan, Time Off with Pay, Employee Assistance Program, Adoption Assistance, Leaves of Absence.
  • Merit-based financial rewards.
  • Flexibility and company-wide commitment to work/life balance.
  • Collaborative team atmosphere that values the contributions of all employees.
  • Learning and development opportunities for ongoing professional growth.

About Tetra Tech:

Tetra Tech is the leader in water, environment, and sustainable infrastructure, providing high-end consulting and engineering services for projects worldwide. With 30,000 employees working together, Tetra Tech provides clear solutions to complex problems by Leading with Science® to address the entire water cycle, protect and restore the environment, design sustainable and resilient infrastructure, and support the clean energy transition.

 

Tetra Tech is proud to be an Equal Opportunity Employer.  All qualified candidates will be considered without regard to race, color, religion, national origin, age, disability, sexual orientation, gender identity, status as a protected veteran, or any other characteristic protected by law. Tetra Tech is a VEVRAA federal contractor and we request priority referral of veterans.

We invite applications from all interested parties.

Explore our open positions at https://www.tetratech.com/careers. Follow us on social media to learn more about our people, culture, and opportunities:

LinkedIn: @TetraTechCareers

X (Twitter): @TetraTechJobs

 

We thank all applicants for their interest, however, only those candidates selected for interviews will be contacted.

Please no phone calls or agencies.

 

My Profile

Create and manage profiles for future opportunities.

Go to Profile

My Submissions

Track your opportunities.

My Submissions

Featured Categories at Tetra Tech